Japan – Hai Phong Industrial Park

VR360 Technology

Japan – Hai Phong Industrial Park

  • Strategic locationStrategic location
  • Incentive policiesIncentive policies
  • Legal documentsLegal documents
  • DeveloperDeveloper

Introduction
Japan – Hai Phong Industrial Park

Nomura – Hai Phong Industrial Park was established on 23 December 1994. It is the earliest foreign-invested industrial park in the North, with comprehensive and modern technical infrastructure and a convenient geographical and transport location. The developer is completing and building phase-two infrastructure, so there is still ample cleared land and land for factory lease, fully meeting investors’ needs.

INDUSTRIAL PARK INFORMATION

  • Developer: PC1 GROUP JOINT STOCK COMPANY
    • Address: 583 Nguyen Trai, Thanh Xuan, Ha Noi
      City, Viet Nam
      – Tel: +84 24 38456329
      – Email: info@pc1group.vn
      – Website: pc1group.vn
  • Tan Tien Commune, An Duong District, Hai Phong
  • Mr. Katsunori Ueno – Head of Sales and Customer Service – Tel: (84) 936 683 379 – Email: k.ueno@nhiz.vn​

Location

  • Proximity
    – 12.7 km from Hai Phong city centre and 90 km from Ha Noi;
    – 19.3 km from Cat Bi Airport;
    – 6 km from Nam Ninh seaport;
    – 9.5 km from Thuong Ly Station;
    – 3 km from National Highway 5.

Investment sectors

  • Priority investment sectors: Supporting industries, light industry
  • Restricted investment sectors: Polluting production

Lease term

  • Phase 1:
    – Start date: 12/11/2008
    – End date: 12/11/2058
  • Phase 2:
    – Groundbreaking: 2025
    – End date: 2075

Minimum lease area

  • 5000 m2

Building height limit

  • Approval of the Hai Phong Economic Zone Authority is required: for areas under 5 ha, approval of the total land area is required; for areas over 5 ha, a 1/500 detailed plan must be approved in accordance with Construction Standard 01/2021.

Rental fees

  • Factory rental: USD 5-6/m2/month

Permitted building coverage

  • Approval of the Hai Phong Economic Zone Authority is required: for areas under 5 ha, the total area must be approved; for areas over 5 ha, a 1/500 detailed plan must be approved in accordance with Construction Standard 01/2021.

Planned area

  • Total area: 153 ha
  • Total vacant area for lease: 123 ha
  • Total area with full infrastructure ready for factory construction: 123 ha

Factories for lease

  • Total area: 2,948.36 m2

Occupancy and number of projects

  • 100%, 51 projects

Operating fees

  • Management fee: VND 2,061/m2/month
  • Electricity: as regulated by the Government
  • Water: VND 21,600/m3
  • Wastewater treatment fee: VND 13,479/m3

Investment advantages
Japan – Hai Phong Industrial Park

  • Financial institutionsFinancial institutions

    Indovina Bank is located right inside the industrial park

  • State administrative and tax authoritiesState administrative and tax authorities

    Hai Phong Tax Department: 15 km

  • Logistics centreLogistics centre

    Yusen Logistics, Dinh Vu Industrial Park: 24.5 km

  • Universities, training institutions, etc.Universities, training institutions, etc.

    Hai Phong University: 12.2 km
    Central Transport College No. 5: 9.2 km

  • Road widthRoad width

    Main gate adjoining Road No. 5