
VR360 Technology
Trang Due Industrial Park
Strategic location
Incentive policies
Legal documents
Developer
Introduction
Trang Due Industrial Park
Trang Due Industrial Park officially began operation in 2007, with Saigon – Hai Phong Industrial Park Joint Stock Company (SHP) as the infrastructure developer. After nearly 15 years of formation and development, Trang Due Industrial Park has become one of the largest and fastest-growing industrial parks in Hai Phong City.
INDUSTRIAL PARK INFORMATION

- Developer: SAIGON – HAI PHONG INDUSTRIAL PARK JOINT STOCK COMPANY
- Encouraged investment sectors:
– Electronics, telecommunications and information technology;
– Precision mechanical engineering;
– Materials.
Area
- Phase 1: 187 ha
- Phase 2: 214 ha
Location
- Distance to the capital Ha Noi: 102 km
- Distance to Hai Phong city centre: 15 km
- Distance to Cat Bi International Airport: 15 km
- Distance to the Ha Noi – Hai Phong railway station: 15 km
- Distance to Thuong Ly river port: 15 km
- Distance to Hai Phong seaport: 15 km
Investment sectors
- Priority investment sectors: High technology,
supporting industries, manufacturing of
environmentally friendly products, etc. - Restricted investment sectors: Textile dyeing
Lease term
- 50 years:
– Trang Due Industrial Park phase I: 2006-2056
– Trang Due Industrial Park phase II: 2014-2064
– Trang Due 3 Industrial Park: expected 2023-2073
Power supply system
- Power station 63 MVA x 3
Wastewater treatment system
- ISO-standard wastewater treatment plant with a maximum capacity of 3,000 m3/day
Occupancy rate
- Phase 1: 100%
- Phase 2: 86%
Water supply system
- Water supply capacity of 20,000 m3/day
Transport system
- Main road: 32 m wide, 04 lanes
- Internal road: 22.5 m, 02 lanes
Planned area
- Total area (m2 or ha): 1,088 ha, of which:
– Trang Due Industrial Park phase 1: 187 ha
– Trang Due Industrial Park phase 2: 214 ha
– Trang Due 3 Industrial Park: 687 ha
Factories for lease
- Leasable area (m2 or ha): 687 ha
– Trang Due Industrial Park Phases 1&2: 100%
occupied.
– Trang Due 3 Industrial Park: 687 ha
– Warehouses and factories: 12,000 m2
Operational status
- Operational status (as of end-2020):
– Trang Due Industrial Park Phases 1&2: 401 ha (100% in operation)
– Trang Due 3 Industrial Park: 687 ha (legal procedures in progress
Occupancy and number of projects
- Occupancy rate % (as of end-2020):
– Trang Due Industrial Park Phases 1&2: 100% occupied.
– Trang Due 3 Industrial Park: 0% (pending legal procedures)
– Number of projects: 112 projects
AMENITY INFRASTRUCTURE
Financial institutionsDistance to the nearest bank: SHINHAN BANK, WOORI BANK inside the industrial park (0.5 km)
State finance and tax authoritiesDistance to the nearest state finance and tax authority: 5 km
Police and public securityDistance to the nearest police station: 1.5 km
Logistics centreDistance to the nearest logistics centre: 35 km
Post officeDistance to the nearest post office: 5 km
Health careDistance to the nearest hospital: 4 km
Road width+ Main road: 40 m (6 car lanes)
+ Branch road: 23 m
Emergency generatorsAvailable
Customs servicesDistance to the nearest customs office: 18 km
Distance to the nearest inland container depot: 27 km
Universities, educational institutions, etc.Distance to the nearest school/vocational training institution
RecruitmentRecruitment support
Worker dormitoriesDistance to the nearest facility: inside the industrial park (0.5 km)
One-stop servicesDistance to the nearest facility: 3 km
Industrial park communications infrastructureAvailable
Fire-fighting facilitiesAvailable
Schools for workers’ childrenDistance to the nearest facility: 4 km
Investment advantages
Trang Due Industrial Park
Comprehensive infrastructure
Abundant workforce
Strategic geographical location
Diverse amenities and services
Preferential tax rates in the Economic Zone

