Building sector

STTAbstract
1

Decision No.: 1030/QD-BQL Decision on the list of administrative procedures under the authority of HAI PHONG ECONOMIC ZONE AUTHORITY Hai Phong

2

Decision No. 1030/QD-BQL on the list of administrative procedures under the authority of HAI PHONG ECONOMIC ZONE AUTHORITY Hai Phong

3

Consulting on EIA Report for the investment project to build the road after ports 3 to 6 in Lach Huyen port area

4

Content of administrative procedures The construction field falls under the authority of the HAI PHONG ECONOMIC ZONE AUTHORITY

5

Issuing construction permits

6

Appraisal of design, construction/design estimate, adjusted construction estimate

7

Appraisal of Economic - Technical Report/Adjusted Economic - Technical Report; construction drawing design, construction estimate/construction drawing design, adjusted construction estimate (in case of 1-step design)

8

Appraisal of basic design/adjusted basic design

9

Adjust, extend and re-issue construction permits

10

Inspect the acceptance work and put the project into use